John F. Kennedy Boulevard Bridges Rehabilitation Project

NECA PDJ Award Winning Project Carr & Duff was the electrical contractor for the PennDOT JFK Boulevard bridge rehabilitation project.

Citizens Bank Park Perimeter Hardening Project

Carr & Duff installed new electrical equipment and circuits for the exterior site security enhancements, including powering a new hydraulic wedge and retractable bollard system, security gate arms and rolling gates around the perimeter of Citizens Bank Park…

Delivery Center

Carr & Duff was the electrical contractor for a fast track new 170,000sq/ft delivery center building project in Southwest Philadelphia, PA.

Carvel Building – 12.4kv Service Upgrade

Carr & Duff installed new15kv EPR cable for two 12.4kv circuits, terminations, load break elbows and17.5kv low-profile load interrupter distribution switchgear at the State of Delaware’s Carvel Building.

Temple Health – Jeanes Hospital Substation

Working with our General Contractor, Carr & Duff constructed a new substation building adjacent to existing power distribution equipment.

Trenton Makes the World Takes

In August 1917 a historic and iconic sign was installed on the Lower Trenton Toll Bridge, and 100 years later in August 2017 Carr & Duff began upgrading it with 21st century technology.

Pemberton Borough Utility Distribution Relocation

Carr & Duff, Inc was tasked with a design-build utility relocation project for the Borough of Pemberton, NJ.

500 Walnut

Carr & Duff completed the power distribution system for a new mixed-use 26-story building and mechanical penthouse, consisting of luxury condominiums, retail space and a fully automated parking facility at 500 Walnut Street.

I-95 BRO

Carr & Duff installed new highway lighting, traffic signalization, sign lighting as well as Intelligent Transportation Systems (ITS) technology for the Betsy Ross BRO interchange improvements in Philadelphia.

Temple University Dental School

Carr & Duff replaced the existing electrical distribution and riser in the 5-story Dental School facility.

Lehigh University 12kv Electrical Conversion

Carr & Duff performed a utility renovation project to convert several Packer campus buildings from PPL utility services to the Lehigh University 12kv underground distribution system.

SEPTA Crum Creek Viaduct Replacement

The original steel version of the Crum Creak Viaduct was built in 1895, spanned 915 feet and stood 100 feet high.

University of Pennsylvania Switchgear Upgrade and Computer Room Modification

Carr & Duff installed a new 15kv electrical service with two 15kv primary medium voltage interrupter switches, two 500kva cast coil 15kv transformers, secondary distribution switchgear…

The New York Yankees AA Affiliate Trenton Thunder Arm & Hammer Ball Park Lighting

Carr & Duff furnished & installed new Musco Lighting 1500w stadium lighting fixtures and new LED wireless controlled grand stand lighting…