Sweeney Field

Project Overview

Carr and Duff furnished the labor, equipment, and material for this Saint Joseph’s University project, which involved the removing and retrofitting the lighting to Sweeney Field.

Part one of the process was removing eight (8) field lighting pole-top structures from their existing 50 feet poles and then disconnecting the lighting circuits at the base of each. After removal, brand new Musco field lighting pole-top structures containing new Musco LED fixtures were installed on those existing eight poles.

The previous lighting circuits were then tied into the new Musco lighting. In addition, C&D installed a new Musco Lighting Control Link System, which enables the new lighting system to be controlled wirelessly and remotely.