Carr & Duff, Inc was tasked with a design-build utility relocation project for the Borough of Pemberton, NJ. Existing utility poles and overhead 5kv distribution wiring had to be replaced for a right-of-way road widening project.

C&D crews built a ¾” mile new pole line adjacent to the existing pole line and installed new primary, secondary wiring as well as new-dual wound transformers and cut-outs. Due to the sequencing of work, temporary jumpers were required to maintain customers and prepare for permanent cut-overs. After completion of energization of the new primary cables and all secondary connections, C&D demolished the old line to the communication utility property demarcation.

Latest Safety News

Winslow Elementary School Storm Response

Winter 2017 was not as severe as winters past on the east coast but we still had our fair share of storms. Being well equipped with the equipment and manpower to get the job done is what makes us stand out during destructive storms. Our expertise was needed in upstate...

read more

Our Recent Safety Committee Discussions

Carr & Duff, Inc. utilizes a Safety Committee made up of field and office personnel. The committee meets monthly to discuss and review issues or items that need to be addressed within the company. The committee is empowered to facilitate change when warranted to...

read more

Philadelphia’s YouthBuilds Charter School

On November 16th, 2016 Carr & Duff, Inc.’s Safety Department taught an “Electrical Safety in Construction” course at Philadelphia’s YouthBuilds Charter School. Carr & Duff, Inc.’s Safety Director, Wayne Sottung taught the interested students about the...

read more

Recent Projects

Temple Health – Jeanes Hospital Substation (2018)

Working with our General Contractor, Carr & Duff, Inc. constructed a new substation building...

Trenton Makes the World Takes (2018)

In August 1917 a historic and iconic sign was installed on the Lower Trenton Toll Bridge, and 100...

Pemberton Borough Utility Distribution Relocation (2018)

Carr & Duff, Inc was tasked with a design-build utility relocation project for the Borough of...