SEPTA Crum Creek Viaduct Replacement (2016)

SEPTA Crum Creek Viaduct Replacement (2016)

The original steel version of the Crum Creak Viaduct was built in 1895, spanned 915 feet and stood 100 feet high. The bridge carries over 3 million passengers annually with 320 passenger trains each week along the Media/Elwyn Line into and out of Center City...

Latest Safety News

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Recent Projects

Temple Health – Jeanes Hospital Substation (2018)

Working with our General Contractor, Carr & Duff, Inc. constructed a new substation building...

Trenton Makes the World Takes (2018)

In August 1917 a historic and iconic sign was installed on the Lower Trenton Toll Bridge, and 100...

Pemberton Borough Utility Distribution Relocation (2018)

Carr & Duff, Inc was tasked with a design-build utility relocation project for the Borough of...