by azahn123@gmail.com | Jan 3, 2016 | Recent Projects
Carr & Duff performed a utility renovation project to convert several Packer campus buildings from PPL utility services to the Lehigh University 12kv underground distribution system. Carr & Duff furnished and installed all materials necessary to complete the...
by azahn123@gmail.com | Jan 2, 2016 | Recent Projects
The original steel version of the Crum Creak Viaduct was built in 1895, spanned 915 feet and stood 100 feet high. The bridge carries over 3 million passengers annually with 320 passenger trains each week along the Media/Elwyn Line into and out of Center City...
by azahn123@gmail.com | Jan 1, 2016 | Recent Projects
Carr & Duff installed a new 15kv electrical service with two 15kv primary medium voltage interrupter switches, two 500kva cast coil 15kv transformers, secondary distribution switchgear with a 1200 AMP main tie main configuration on the substation secondary....