Lehigh University 12kv Electrical Conversion (2016)





Furnish all labor, equipment and materials required to convert several buildings on the Lehigh University Packer Campus from PPL utility services to the Lehigh electric power grid. As part of this project, we furnished and installed high voltage wiring and terminations, duct banks, 15kV load break junctions, pad mount transformers, an indoor transformer, a main distribution panel, grounding, metering and low voltage wiring and conduit. We also provided hand-holes, bollards, transformer vaults and site restoration and removed existing transformers and underground cables that were no longer needed.